high power 500kw gas steam boiler for heating

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :high power 500kw gas steam boiler for heating
  • Supply Capacity : 10 units/month :high power 500kw gas steam boiler for heating
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

Get display discount

Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Classes of high risk work - WorkSafe Tasmania

    Dec 31, 2013 · In a steam engine, the superheater re-heats the steam generated by the boiler, increasing its thermal energy and decreasing the likelihood that it will condense inside the engine. Steam which has been superheated. is logically known as superheated steam; non-superheated steam is called saturated steam or wet steam.Get Price

  • Economics | PDF | Heat Transfer - Scribd

    The steam leaves the boiler drum with a quality of 98%. The unit consumes 3 kg of coal per second as received having a heating value of 25,102 KJ/kg. What would be the overall efficiency of the unit in percent? Steam properties: At 5 Mpa and 400 oC : h = 3195.7 KJ/kg At 5 Mpa: hf = 1154.23, hfg = 1640.1 Ata. 65.Get Price

  • Economics | PDF | Heat Transfer - Scribd

    The steam leaves the boiler drum with a quality of 98%. The unit consumes 3 kg of coal per second as received having a heating value of 25,102 KJ/kg. What would be the overall efficiency of the unit in percent? Steam properties: At 5 Mpa and 400 oC : h = 3195.7 KJ/kg At 5 Mpa: hf = 1154.23, hfg = 1640.1 Ata. 65.Get Price

  • Economics | PDF | Heat Transfer - Scribd

    The steam leaves the boiler drum with a quality of 98%. The unit consumes 3 kg of coal per second as received having a heating value of 25,102 KJ/kg. What would be the overall efficiency of the unit in percent? Steam properties: At 5 Mpa and 400 oC : h = 3195.7 KJ/kg At 5 Mpa: hf = 1154.23, hfg = 1640.1 Ata. 65.Get Price

  • Waste Gasification Power Plant-Waste Gasification Power

    The third step is gas power generation through the gas engine. The high temperature exhaust flue gas produced by the gas engine can be reused by waste heat boiler to generate steam or hot water for civil or industrial use and can also provide heat for the drying process of the RDF.Get Price

  • Compiled Questions in Mathematics (Moodle) | PDF

    A cylindrical steam boiler is to be constructed having a capacity of 1000 cu. m. The material for the sides cost P 2000.00 per square meter and for the ends P 3000.00 per square meter. Find the radius so that the cost is least. A. 3.52 m B. 4.12 m C. 4.73 m D. 5.25 m 448.Get Price

  • Classes of high risk work - WorkSafe Tasmania

    Dec 31, 2013 · In a steam engine, the superheater re-heats the steam generated by the boiler, increasing its thermal energy and decreasing the likelihood that it will condense inside the engine. Steam which has been superheated. is logically known as superheated steam; non-superheated steam is called saturated steam or wet steam.Get Price

  • Classes of high risk work - WorkSafe Tasmania

    Dec 31, 2013 · In a steam engine, the superheater re-heats the steam generated by the boiler, increasing its thermal energy and decreasing the likelihood that it will condense inside the engine. Steam which has been superheated. is logically known as superheated steam; non-superheated steam is called saturated steam or wet steam.Get Price

  • Compiled Questions in Mathematics (Moodle) | PDF

    A cylindrical steam boiler is to be constructed having a capacity of 1000 cu. m. The material for the sides cost P 2000.00 per square meter and for the ends P 3000.00 per square meter. Find the radius so that the cost is least. A. 3.52 m B. 4.12 m C. 4.73 m D. 5.25 m 448.Get Price

  • Waste Gasification Power Plant-Waste Gasification Power

    The third step is gas power generation through the gas engine. The high temperature exhaust flue gas produced by the gas engine can be reused by waste heat boiler to generate steam or hot water for civil or industrial use and can also provide heat for the drying process of the RDF.Get Price

  • Waste Gasification Power Plant-Waste Gasification Power

    The third step is gas power generation through the gas engine. The high temperature exhaust flue gas produced by the gas engine can be reused by waste heat boiler to generate steam or hot water for civil or industrial use and can also provide heat for the drying process of the RDF.Get Price

  • Compiled Questions in Mathematics (Moodle) | PDF

    A cylindrical steam boiler is to be constructed having a capacity of 1000 cu. m. The material for the sides cost P 2000.00 per square meter and for the ends P 3000.00 per square meter. Find the radius so that the cost is least. A. 3.52 m B. 4.12 m C. 4.73 m D. 5.25 m 448.Get Price