commercial 300 bhp electric boiler
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
The "Wacht am Rhein VII" was built in 1893 as a Rhein tug by the P. Boele Shipyard at Slikkerveer in Holland. She was a tug powered by a coal fired boiler, a compound engine developing 300 IHP and was designed specially for the middle part of the river Rhein which has lots of bends and very strong currents.Get Price
The boiler receive energy from 7kg/sec of 954deg.C dry air. After passing through a waste heat boiler, the temperature of the air is has been reduced to 343deg.C. How much steam in kg is produced per second? Note: at 4.80Mpa dry saturated, h=2796. A. 1.30 B. 0.92 C. 1.81 D. 3.43 A diesel electric plant supplies energy for Meralco.Get Price