combined 20 ton condensing boiler for sale
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
Boiler systems with design input of greater than 1,000,000 Btu/h (293 kW) shall comply with the turndown ratio specified in Table C403.3.4. The system turndown requirement shall be met through the use of multiple single-input boilers, one or more modulating boilers or a combination of single-input and modulating boilers. TABLE C403.3.4. BOILER Get Price
A simple version of this heat exchange process is included in Figure 2-26. Gas flow may be regu- lated, usually by a damper, to control the amount of heat recovery. This system, depending on the volume and temperature of the flue gas, can act as the primary or secondary source of process steam when combined with a conven- tional boiler system.Get Price
Boiler systems with design input of greater than 1,000,000 Btu/h (293 kW) shall comply with the turndown ratio specified in Table C403.3.4. The system turndown requirement shall be met through the use of multiple single-input boilers, one or more modulating boilers or a combination of single-input and modulating boilers. TABLE C403.3.4. BOILER Get Price
D Steam leaves an industrial boiler at 827.4 Kpa and 171.6 deg. C. A portion of the steam is passed through a throttling calorimeter and is exhausted to the atmosphere when the calorimeter pressure is 101.4 Kpa. How much moisture does the steam leaving the boiler contain if the temperature of the steam at the calorimeter is 115.6 Deg. C.Get Price
The delivery and assessments are carried out by a Welding Institute Qualified, CSWIP trained Weld Tester. PPE will be required for the course: Appropriate PPE must be worn in the workshop (cotton boiler suit and steel toe capped boots must be brought by the candidate, although we can provide gloves and masks for the duration of the course). NB.Get Price