industrial 150 bhp vacuum hot water boilers
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
Dec 17, 2013 · Use this to refill your radiator system before you use it. NEVER FILL IT WHILE THE BOILER IS HOT! If your boiler is running but the radiators are cool, you probably need to top off the water. Again, WAIT UNTIL THE BOILER COOLS DOWN FIRST. There should be a water libel gauge somewhere near the boiler to indicate that you have it filled correctly.Get Price
A water tube boiler evaporated 5.05 kg of water per second from a feed water temperature of 104.44 °C to steam at 1241.1 kPa and quality of 0.97; weight of coal fuel per second 0.57 kg; higher heating value of coal as fired, 11,800 Btu/lb. Determine the rate of absorption in kJ/s, the boiler horsepower, and the efficiency of steam generating Get Price
ModuleAir® is an innovative modular air-cooled condenser (ACC) that directly condenses steam turbine exhaust flow and return condensate to the boiler without any water loss. With construction savings of up to 25%, compared to a standard A-frame, construction time can be reduced by several months for large power plants.Get Price
A water tube boiler evaporated 5.05 kg of water per second from a feed water temperature of 104.44 °C to steam at 1241.1 kPa and quality of 0.97; weight of coal fuel per second 0.57 kg; higher heating value of coal as fired, 11,800 Btu/lb. Determine the rate of absorption in kJ/s, the boiler horsepower, and the efficiency of steam generating Get Price
In commercial or industrial boiler installations, boilers are rated based on their square feet of heating surface. Packaged boilers today are commonly rated on the basis that 5 sq. ft. of heating surface will produce 1 boiler horsepower, or 33, 500 btu of useful heat, and some claim even less surface required per BHP.Get Price
In commercial or industrial boiler installations, boilers are rated based on their square feet of heating surface. Packaged boilers today are commonly rated on the basis that 5 sq. ft. of heating surface will produce 1 boiler horsepower, or 33, 500 btu of useful heat, and some claim even less surface required per BHP.Get Price
Building Code - Boilers: Boiler Installation: Minimum Permit Fee: Bldg. Code Sec. 118.1.3: $80.63: 1/1/2021: Building Code - Boilers: Boiler Installation Maximum Permit Fee: Bldg. Code Sec. 118.4(1) $3,455.57: 1/1/2021: Building Code - Boilers: Boiler annual fee (not subject to minimum fee) Bldg. Code Sec. 118.4(2) $59.45: 1/1/2021: Building Get Price
Question 11.20 A brass boiler has a base area of 0.15 m2 and thickness 1.0 cm. It boils water at the rate of 6.0 kg/min when placed on a gas stove. Estimate the temperature of the part of the flame in contact with the boiler. Thermal conductivity of brass = 109 J s–1 m–1 K–1 ; Heat of vaporisation of water = 2256 × 103 J kg–1.Get Price