200 bhp water tube steam boilers for sale
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
These requirements apply to boilers with rated input of 8,000,000 Btu/h or less that are not packaged boilers and to all packaged boilers. Minimum efficiency requirements for boilers cover all capacities of packaged boilers. Maximum capacity — minimum and maximum ratings as provided for and allowed by the unit's controls.Get Price
These quick start boilers are available for sale with steam design pressures up to 3000 psig. We offer two product lines for your boiler and steam generation needs. One line covers from 15 to 200 BHP (150 to 1,962 kW) or 518 to 6,900 pounds per hour (235 to 3,130 kg/hr).Get Price
Six Yarrow oil-fired water tube boilers supplied steam at 425 lb/psi and 725 degrees superheat. The main engines developed 30,000 shp on five boilers (leaving one in reserve) for a normal service speed of 21 knots.Get Price
These requirements apply to boilers with rated input of 8,000,000 Btu/h or less that are not packaged boilers and to all packaged boilers. Minimum efficiency requirements for boilers cover all capacities of packaged boilers. Maximum capacity — minimum and maximum ratings as provided for and allowed by the unit's controls.Get Price
Six Yarrow oil-fired water tube boilers supplied steam at 425 lb/psi and 725 degrees superheat. The main engines developed 30,000 shp on five boilers (leaving one in reserve) for a normal service speed of 21 knots.Get Price
These requirements apply to boilers with rated input of 8,000,000 Btu/h or less that are not packaged boilers and to all packaged boilers. Minimum efficiency requirements for boilers cover all capacities of packaged boilers. Maximum capacity — minimum and maximum ratings as provided for and allowed by the unit's controls.Get Price
Her power was from twin steam boilers powering twin triple expansion engines to two screws with a H.P of 1400 giving a top speed of 13 knots. She carried a crew of 160 and was lightly armed with one 37 mm rapid fire cannon and one 8mm machine gun both on pedestal mountings. Details of the kit: Scale: 1/50 Length: 1.157m (45.5")Get Price
These requirements apply to boilers with rated input of 8,000,000 Btu/h or less that are not packaged boilers and to all packaged boilers. Minimum efficiency requirements for boilers cover all capacities of packaged boilers. Maximum capacity — minimum and maximum ratings as provided for and allowed by the unit's controls.Get Price
These quick start boilers are available for sale with steam design pressures up to 3000 psig. We offer two product lines for your boiler and steam generation needs. One line covers from 15 to 200 BHP (150 to 1,962 kW) or 518 to 6,900 pounds per hour (235 to 3,130 kg/hr).Get Price
Her power was from twin steam boilers powering twin triple expansion engines to two screws with a H.P of 1400 giving a top speed of 13 knots. She carried a crew of 160 and was lightly armed with one 37 mm rapid fire cannon and one 8mm machine gun both on pedestal mountings. Details of the kit: Scale: 1/50 Length: 1.157m (45.5")Get Price